Wider roads and the traffic jam that comes back

A TU Dresden study says Germany's road plan expects almost no new traffic from new lanes. Chasing that gap led me to systems thinking, and to why sensible fixes keep bringing their problem back.

Give a road network 10% more lanes and how much more driving do you get? According to a team at TU Dresden, the model behind Germany’s federal transport plan answers something close to 1%, going by my arithmetic on their figures. Their own reading of the international research puts it between 3% and 9%.

That gap stopped me, mostly because of what I had assumed. Roads, I thought, are something you build for traffic that already exists. If a road can produce traffic, my mental picture had an arrow missing. Hunting for that arrow took me through an economics paper from 2011, a British government review, and eventually an idea I’ve heard named many times and could never have defined: systems thinking.

Nobody needed me to know any of this. I was simply curious, so the reading happened in my free time, and these are the notes from it. They begin with the road, since it’s the cleanest measured example I could find of what the whole subject is about.

What the extra lanes did

The paper is by Gilles Duranton and Matthew Turner, and it carries a title with some nerve for an economics journal: “The Fundamental Law of Road Congestion”. Using traffic data for US metropolitan areas in 1983, 1993 and 2003, they found that vehicle-kilometres travelled rise in proportion to lane-kilometres of interstate highway, with an elasticity (the percentage response to a 1% change) very close to one. Ten per cent more interstate lanes, about ten per cent more interstate driving. The working paper version adds that traffic has completely caught up in under ten years.

Current residents drive more, commercial traffic grows and people move in. Some of that I’d have guessed. The next line of the abstract I would not have: “We find no evidence that the provision of public transportation affects VKT”, VKT being those vehicle-kilometres. Their conclusion covers both halves, saying that “increased provision of roads or public transit is unlikely to relieve congestion”. I have repeated “build better trains and the motorway will empty” as though it were obvious, so that one stung a little.

The mechanism turns out to be plain enough. A statement from Hesse’s scientific climate advisory board, dated 20 January 2026, describes it in ordinary words: faster and more comfortable car trips make driving more attractive, so people make more and longer trips, some move over from public transport, and new bottlenecks appear elsewhere in the network.

Four answers to one question

Before anyone quotes a single number at a planning meeting, look at how far apart they are:

Who saysMeasuring whatExtra driving from 10% more lanes
Duranton and TurnerUS interstates in metropolitan areasAbout 10%
WSP and RAND Europe, for the UK transport ministryWhole networks, US states and the NetherlandsAbout 2%
TU Dresden’s reading of 28 studiesRange it considers a fair guide3% to 9%
Germany’s federal plan, as TU Dresden calculates itAll planned road projects togetherAbout 1%
Elasticities restated as percentages, the first, third and fourth by my arithmetic.

The British figure comes from an evidence review of 25 papers, written in May 2018 for the Department for Transport. It calls its conclusions tentative, expects the effect to be larger in urban areas and on highly congested routes, and finds little evidence of extreme induced traffic on England’s strategic roads. So a jammed interstate and a quiet bypass are different animals, and the study you pick decides which one you get to talk about.

TU Dresden’s study, dated October 2025 and written by Richard Hartl and three colleagues for that same advisory board, says openly that US results carry over to Germany only to a limited extent, and that it found no research looking specifically at German regions. The roughly 1% in the table is an elasticity of 0.09 for the plan as a whole, and it hides some variation: new motorways come out at 0.20, widening projects lower. The headline finding is about climate. Emissions from all the planned road projects are underestimated by up to a factor of three, it says, chiefly because the plan’s method barely counts induced traffic, and in its two re-estimates driving rises about three and about eight times more than forecast. A climate board asked the question, which is worth keeping in mind, and the authors themselves say individual road decisions should weigh other goals such as accessibility, noise and safety.

The same economists warn against a conclusion I was about to draw. Traffic coming back does not on its own prove a road was worthless, because (as I read their argument) the extra trips count for something as well. They still come out against more building on driver benefits alone, with gains well below the cost, but the reason they give is that new roads don’t lower the cost of travel by enough.

Somebody already had a name for this

Road building is the very first item on a list John Sterman published in the American Journal of Public Health in 2006. He calls the general problem policy resistance, “the tendency for interventions to be defeated by the system’s response to the intervention itself”. Further down the list you find low-tar cigarettes, where smokers compensate by smoking more and holding the smoke longer. Levees and dams made floods worse, and people then settled the flood plains believing they were safe. Antibiotics bred resistant bugs.

Then he writes the line I keep going back to: “there are no side effects—just effects.” What we expected or liked gets called the main effect, and we take the credit. The rest gets labelled a side effect, and that label, he argues, is a sign that our mental models are drawn too narrowly and our time horizons are too short. It annoyed me at first, because some things really are accidents. Then I thought about the levee again.

Jay Forrester, then a professor at MIT’s Sloan School of Management, said much the same about companies in a paper first published in 1971. Take the stated policies of a troubled firm, put them into a computer model, and in many instances “the known and intended practices of the organization are fully sufficient to create the difficulty”. Worse, the people involved see the trouble grow and do more of whatever they believed was the cure. Nobody in that story needs to be stupid or dishonest, which I find more unsettling than if they were.

Three depths of looking at a jam

What finally made this usable for me was a picture from Daniel Kim, who separates three levels of understanding. Events are things that happen: the road was jammed on Tuesday, and all you can do is react. Patterns are behaviour over time: traffic climbing along with lane-kilometres, which lets you anticipate. Underneath sits systemic structure, the arrangement that produces the pattern, and Kim says the power of systems thinking comes from working at that level, because that’s where you can change the source instead of the symptom.

Structure sounded vague until I tried it on the road. Wider road, faster trips, more and longer trips, more cars, slower road. That is my own sketch and a crude one, but look at where it ends: back at the thing it started from.

Sterman says it directly: “our actions feed back on themselves.” The difference from a one-way chain is easy to show with a lawn sprinkler. On a timer it runs in the pouring rain, because the chain goes one way and stops. Give it a rain sensor and the water it adds comes back round as information about how wet the ground already is. Donella Meadows calls the thermostat the classic example of the second kind, a loop built to hold a room at a desired temperature. Most of what I’ve read so far amounts to saying that our instincts were formed on the first kind and the world is full of the second.

Forrester said something similar in 1971: experience with simple systems “leads us to look close to the symptoms of trouble for a cause”. Sterman adds the detail that explains why this keeps fooling people. Delays mean the long run often looks different from the short run, and weak interventions tend to bring a spell of relief before the problem grows back. A road that flows nicely in the year after it opens hasn’t answered anything yet.

What I’m not buying yet

Sterman’s list of reasons includes the sentence “Everything is connected to everything else.” I’m wary of that. A way of thinking that explains every outcome ends up explaining none, and a lot of what passes for systems thinking online looks to me like drawing arrows until the page is full. What won me over about the road is that you can count the cars and find out you were wrong, and the table above shows people still disagreeing about the count. I intend to hold the rest of this subject to the same standard. If a diagram can’t turn out to be wrong, I’m not interested in it.

Where the notes go from here

Next I want to pin down the two kinds of loop, because I’ve been using the phrase “positive feedback” wrong for most of my life. Why a quantity piling up behaves so differently from the flow feeding it will need a post of its own after that.

Sources

I went back to each of these originals and checked them in November 2026:

More entries

  1. What Germany wants from you before your first hen arrives

    Germany's first Newcastle disease outbreaks in 30 years sent me to the rules for keeping a few hens. A notification before the first bird, a state fund, a vaccination duty and a small standing list of chores.

    6 min read
  2. Who the 2030 quantum deadline applies to

    I went through seven documents that put a year on the post-quantum switch and wrote down who each is addressed to. Most of them turn out not to bind anybody I know, and Germany's says so itself.

    7 min read
  3. What a tonne of clinker owes at the EU border

    I read "97.5%" as a 2.5% charge, and I was off by a factor of more than twenty. Here is the actual sum for a tonne of cement clinker under the EU carbon border rules.

    6 min read