A working almanac Sunday, 29 November 2026
Reviery

Topic: AI Data Centers  ·   —  7 min read

A computer manual with a section on leaks

A heading in NVIDIA's rack manual stopped me: Leak Detection. Chasing it led to why AI data centres are physically different, how rare they still are, and why they've landed in every energy argument at once.

Near the bottom of NVIDIA’s user guide for its big AI racks, right after the note on serial console access, there’s a heading I read twice: Leak Detection. Underneath, a short paragraph explains that catching leaks “prevents damage to equipment, ensures system reliability and uptime, protects data integrity, and maintains safety”. This is a manual for a computer, and it’s fretting about plumbing.

My picture of a data centre was a chilly room of cabinets and loud fans, and apparently nobody had updated it. That was enough to make me curious, and since then a fair bit of my free time has gone on the documents the people who build these places rely on: vendor manuals, engineering white papers, the Uptime Institute’s industry surveys, the International Energy Agency’s figures. What follows are my notes on the question behind that heading. What physically separates an AI data centre from the kind we’ve had for years, and why has it all arrived at once?

Three hundred homes in one cabinet

A rack is the tall metal cabinet that servers get stacked into, and the number that defines one is how much electricity it draws. NVIDIA’s guide gives its GB200 rack, which holds 72 GPUs (the graphics processors that do the heavy arithmetic for AI), as “approximately 120kW”. Vertiv’s reference design for six of these systems plans 130 kW per compute rack, and Supermicro’s product page says 132 kW. Those are a consumption figure, a design load and a product rating, so they aren’t quite the same measurement. I’ll say 120 to 130 kW and not fuss further.

I can’t picture 120 kW, so I did a sum. Germany’s federal statistics office gives 3,383 kWh of electricity per household for 2021, the newest year in its table. Run at 120 kW through all 8,760 hours of a year, a rack would use about 1,051,000 kWh, which comes to roughly 310 of those households by my arithmetic. It doesn’t run that evenly, as you’ll see further down. Even so, that’s a small village’s electricity in one piece of furniture.

Most data centres are nothing like this

This was my first correction. The Uptime Institute’s 2026 survey of data centre operators, carried out between 17 March and 1 May, has the useful habit of saying what’s ordinary, and ordinary turns out to be small. The most common rack still draws somewhere in the 4 to 5 kW band, where the industry has sat for more than a decade. NVIDIA’s rack, by my division, draws 24 to 30 times that.

Which rackPower per rack
Still the most common band in deployment4 to 5 kW
Where Uptime expects most new racks to convergeabout 10 kW
Uptime’s lower bound for “high density”30 kW
NVIDIA’s GB200 rack, per its user guideabout 120 kW
Sources: Uptime Institute Global Data Center Survey 2026; NVIDIA DGX GB user guide.

Averages make this slippery. The survey’s headline is that the average “modal” rack (the most typical one at each site) passed 11 kW for the first time, up from 9 kW in 2025. Take out a small number of new high-density sites and the figure drops to 7.8 kW. Most facilities still have no rack at all at 30 kW or above. Some 24% do (19% in 2025), and most of that increase came from racks of 50 kW and up, which about one in seven respondents now have, including some sites with racks above 100 kW.

So the AI hall is the exception, and I’d been treating it as the rule. Uptime’s numbers held a second correction for me. I had assumed AI was what pushed racks to high densities at all, and below 50 kW it isn’t: ordinary enterprise software such as databases and resource planning dominates. Above 50 kW, high-performance computing and AI training lead the list, and AI inference (running a finished model rather than building one) has drawn level with training for the first time, at 21% of respondents each. Whatever the workload, the building is happening. In the same survey 52% of respondents had built or upgraded high-density space in the previous 12 months, and 70% planned to in the following 12.

Why it suddenly seems to be everywhere

Electricity, mostly. The International Energy Agency (IEA) said in April 2025 that data centres used about 415 TWh in 2024, around 1.5% of the world’s electricity, with the United States accounting for 45% of that, China for 25% and Europe for 15%. Its update of April 2026 says consumption grew 17% in 2025 and that AI-focused data centres grew by 50%. The central projection in that update runs from 485 TWh in 2025 to 950 TWh in 2030, around 3% of global demand, with AI-focused sites tripling.

Three percent of the world’s electricity doesn’t sound like a catastrophe to me, and I’d be wary of anyone who treats it as the whole energy story. Where it lands is the trouble. The IEA points out that AI-focused sites can draw as much as aluminium smelters yet are much more concentrated, with nearly half of US data centre capacity sitting in five regional clusters. In its 2025 report a typical AI-focused site used as much electricity as 100,000 households, and the largest then under construction would use 20 times as much. For Europe it expected growth of more than 45 TWh by 2030, up 70% on 2024. These are projections, and the agency says it will keep revising them. Its 2026 update also notes, flatly, that “communities push back against data centre projects”. I want to understand that fight before I have an opinion on it.

What changes inside the cabinet

Back to that heading in the manual. Heat is the reason for it. A 2021 white paper from ASHRAE, the American society for heating and cooling engineers, says a rack of 40 to 50 kW could need up to 5,000 cubic feet of air a minute, while the very best floor tile delivers about 1,900. That’s for a rack drawing less than half the power of NVIDIA’s. So in these machines the processors sit on cold plates with liquid running through them, and fans are left to deal with the networking and storage. Uptime’s 2024 cooling survey is the latest one I could read for free, and in it 22% of respondents said their organisation used direct liquid cooling somewhere, with nearly half of those users having it in under 10% of their racks. A leak paragraph in a computer manual is new to plenty of people besides me, then.

What got me more was that the load doesn’t sit still. Authors from Microsoft, OpenAI and NVIDIA explain in a 2025 preprint that during AI training the GPUs work in lockstep. Power in a compute phase “can be close to its TDP”, the power the chip is rated for, and during the phase where they swap results it “can be close to the idle power”. In a big enough job everything does this together: “In extreme cases, aggregate power consumption can oscillate by tens of megawatts within a single datacenter.” Uptime’s analysts add that racks of this type can climb suddenly from around 60 or 70 kW to more than 150 kW, against a maximum specification of 132 kW. My 310 households were built on a much steadier number than these machines run on.

Next, the pipes

Next I want to follow the heat out of that cabinet, from the chip to the open air, because I still can’t picture how a hundred kilowatts leaves a room through pipes. What those power swings do to the grid, and how much water these buildings really drink, are on my list after that.

Sources

Each one opened and checked again in November 2026:

More entries

  1. What Germany wants from you before your first hen arrives

    Germany's first Newcastle disease outbreaks in 30 years sent me to the rules for keeping a few hens. A notification before the first bird, a state fund, a vaccination duty and a small standing list of chores.

    6 min read
  2. Who the 2030 quantum deadline applies to

    I went through seven documents that put a year on the post-quantum switch and wrote down who each is addressed to. Most of them turn out not to bind anybody I know, and Germany's says so itself.

    7 min read
  3. What a tonne of clinker owes at the EU border

    I read "97.5%" as a 2.5% charge, and I was off by a factor of more than twenty. Here is the actual sum for a tonne of cement clinker under the EU carbon border rules.

    6 min read